低渗透油藏合理关井测压时间的确定DETERMINATION OF THE REASONABLE SHUT-IN PRESSURE MEASURING TIMES IN THE LOW-PERMERBILITY OIL RESERVOIR
杨昕谅,周洪亮
YANG Xinliang,ZHOU Hongliang
摘要(Abstract):
为了提高试井解释参数的可靠性,减少因关井导致的产量损失,开展了低渗透油藏合理关井测压时间研究。依据压力恢复曲线,考虑井筒储集效应及表皮效应的影响给出常规关井时间的确定方法;考虑边界或供油半径对关井时间的影响,通过半对数曲线回归得到探测半径与关井时间的数学表达式。特低渗透油藏测试的合理关井时间确定方法:选取常规方法计算的合理关井时间及受邻井干扰时间两项中的最小值。利用该方法确定的合理关井测压时间可以有效指导试井方案实施,加深对低渗透油层动态特征认识。
In order to improve the reliability of well test interpretation and reduce the production lose due to the well shut-in,the researches on the reasonable pressure measuring time are conducted for the low-permeability oil reservoir.By means of the pressure buildup curve and considering the influences of the borehole storage and skin effects,the determing methods for conventional shut-in time are presented;in the consideration of the effects of the boundaries and oil drainage radius on the time,and moreover with the help of the semi-log plot regression,the mathematical expression between the investigation radius and shut-in time is obtained.The determining method of reasonable shut-in testing time in extra-low-permeability oil reservoirs shows as follows:to he is selecting the minimum value between the reasonable shut-in time from the conventional calculating methods and interferred time by the offset wells.The reasonable shut-in testing time by this method can provide the guide for the effective implementation of well test program and deepen the cognition of the performance characteristics of the low-permeability reservoir.
关键词(KeyWords):
关井时间;压力恢复曲线;泄油半径;试井
shut-in time;pressure buildup curve;drainage radius;well test
基金项目(Foundation): 国家自然科学基金重点项目“低渗透油层提高驱油效率的机理研究”(50634020)
作者(Author):
杨昕谅,周洪亮
YANG Xinliang,ZHOU Hongliang
参考文献(References):
- [1]LIU Chunlin,YIN Hongjun,DOU Shuping.Productivity Analysis of Fractured Wells in Low-permeability Naturally Fractured Reservoirs[C].Asia-Pacific Power and Energy Engineering Conference(APPEEC2010),Chengdu,China,2010.
- [2]张绍辉,尹洪军,周洪亮,等.复杂裂缝条件下压裂井压力动态分析[J].科学技术与工程,2010,10(12):2865-2867.
- [3]DAtta-Gupta A,Vasco D W,Long J C S.Sensitivity and Spatial Resolution of Transien Pressure and Trace Data for Heterogeneity Characterization[R].SPE30589,1995.
- [4]YIN Hongjun,ZHANG Shaohui.Pressure Transient Analysis of Vertically Fractured Multi-well System[C].Asia-Pacific Power and Energy Engineering Conference(APPEEC2010),Chengdu,China,2010.
- [5]付春权,尹洪军,刘宇,等.低速非达西渗流垂直裂缝井试井分析[J].大庆石油地质与开发,2007,26(5):53-56.
- [6]YIN Hongjun,HE Yingfu,FU Chunqun.Pressure transient analysis of heterogenous reservoirs with impermeability barrier using perturbation boundary element method[J].Journal of Hydrodynamics,Ser.B,2005,17(1):102-109.
- [7]于金珠,唐亚会.复杂低渗气藏气井试井评价方法探讨[J].大庆石油地质与开发,2008,27(4):82-85.
- [8]Olarewaju J S,Lee W J.An analytical model for composite reservoirs produced at either constant bottomhole pressure or constant rate[R].SPE16763,1987.
- [9]侯英敏,同登科,廉培庆.动边界低渗透双重介质分形油藏非线性流动[J].大庆石油地质与开发,2008,27(6):59-64.
- [10]崔忠华.合理确定汪家屯气田动态监测气井关井时间[J].中国石油和化工标准与质量,2013,33(13):46-46.
- [11]Vairogs J,Hearn C L.Effect of Rock Stress on Gas Production from Low Permeability Reservoirs[R].SPE3001,1971.
- [12]高阳,赵超,董平川,等.致密气藏变异流能力裂缝压裂水平井不稳定渗流模型[J].大庆石油地质与开发,2015,34(6):141-147.
- [13]崔迪生,贺子伦,郭宝健,等.径向复合油藏探测半径计算方法[J].油气井测试,2005,14(1):15-16.
- [14]Stehfest H.Numerical inversion of Laplace transforms.[J].Communications of the ACM,1970,13(1):47-49.
- [15]罗赛虎,徐维生.低渗非达西渗流研究综述[J].灾害与防治工程,2007,10(1):38-44.
- [16]肖曾利,蒲春生,秦文龙.低渗油藏非线性渗流特征及其影响[J].石油钻采工艺,2007,29(3):105-107.
- [17]薛国庆,李闽,王道成.低渗非均质油藏数值模拟研究[J].断块油气田,2007,14(4):43-44.
- [18]杨秀祥,程时清,袁玉金,等.特低渗透油藏试井解释中的模型选择及油藏诠释[J].油气井测试,2007,16(2):14-16.
- [19]徐苏欣,曹全芳.确定低渗透油藏启动压力的简便方法[J].小型油气藏,2006,11(4):40-41.