大庆石油地质与开发

2007, No.120(02) 62-66

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

大庆油田“十一五”期间油田开发主要技术对策研究
Study on main technical strategy of oilfield development during the eleventh five-year plan in Daqing Oilfield

王凤兰,石成方,田晓东,吴晓慧
WANG Feng-lan1,2,SHI Cheng-fang1,2

摘要(Abstract):

“十一五”期间大庆油田整体上已进入高含水和高采出程度时期开采,目前,70%的可采储量位于高含水层,但主力老油田仍是油田开发的主体;聚合物驱仍是主要的提高采收率技术,但开采对象已由北部的主力油层转向南部的主力油层和北部的二类油层;外围油田也是增加可采储量的主要方向,但90%的储量位于特低丰度、特低渗透及复杂断块油藏。该文深入分析了“十一五”油田开发面临的主要矛盾和问题,研究了油田主要开发调整潜力,提出了油田开发调整的主要技术措施,为油田开发调整及科研攻关指明了方向,为大庆油田“十一五”开发部署提供了重要依据。
Daqing Oilfield has entered the stage of high water cut and high recovery degree during the eleventh five-year plan.At present,70% recoverable reserves are located in high water cut layers,and the major old oilfields are still dominant for oilfield development.Polymer flooding is still the main EOR technique,but production target has transferred from major reservoirs in the north to major reservoirs in the south and second-class reservoirs in the north.Peripheral oilfields are also the main direction to increase recoverable reserves,but 90% reserves are located in ultra-low abundance,ultra-low permeability and complex fault-block reservoirs.Starting from present development status of Daqing Oilfield,this paper analyzes main contradiction and problems of oilfield development during the eleventh five-year plan,studies main adjustment potential for oilfield development,and proposes major technical strategy for oilfield development adjustment so as to point out direction for oilfield development adjustment and scientific research,and also provides important foundation for development deployment during the eleventh five-year plan.

关键词(KeyWords): 高含水;潜力;调整;聚合物;技术政策
high water cut;potential;adjustment;polymer;technical strategy

Abstract:

Keywords:

基金项目(Foundation): 中国石油股份公司“大庆喇萨杏油田特高含水期水驱优化调整配套技术”项目(040115)部分成果

作者(Author): 王凤兰,石成方,田晓东,吴晓慧
WANG Feng-lan1,2,SHI Cheng-fang1,2

参考文献(References):

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享