大庆石油地质与开发

2008, No.125(01) 61-62+66

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

注水开发效果评价中单因素评价向量的确定新方法
A new method of determining single factor evaluation vector in effect evaluation of water injection development

王怒涛,罗兴旺,张艳梅,赵军
WANG Nu-tao1,LUO Xing-wang2,ZHANG Yan-mei2,ZHAO Jun2(1.Petroleum Engineering Institute

摘要(Abstract):

将模糊综合评价方法应用于注水开发效果评价中取得了比较理想的效果,其关键是单因素评价向量的确定。首先结合注水开发油田水驱开发效果评价理论,确定了单因素评价向量应遵循的几个基本原则,然后引入经典的岭形分布函数,采用新的方法得出了模糊综合评价应用于水驱开发效果等综合评价时的隶属函数,根据这些隶属函数就可得出单因素评价向量。大量的实例计算表明,该单因素评价向量确定方法符合油田生产实际,值得推广。
Fuzzy comprehensive evaluation applied in effects evaluation of water injection development has achieved perfect effect,the key is determination of single factor evaluation vector.Various basic rules has been determined,combining with effect evaluation principle of water flooding development in its development oilfield,then chine distribution function is introduced and membership function is obtained when this method is applied in water flooding development effects.Finally single factor evaluation vector can be obtained based on these membership function.Several examples demonstrate that,this method for single factor evaluation vector coincides with practical production.

关键词(KeyWords): 单因素评价向量;注水开发;综合评价
single factor evaluation vector;water injection development;comprehensive evaluation

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 王怒涛,罗兴旺,张艳梅,赵军
WANG Nu-tao1,LUO Xing-wang2,ZHANG Yan-mei2,ZHAO Jun2(1.Petroleum Engineering Institute

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享