大庆石油地质与开发

2006, (S1) 8-9+113

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

应用周期注采技术改善特高含水期开发效果
Using Cyclic Injection-production Technology to Improve the Development Effect of Water Flooding in Ultra-high Water Cut Stage

高淑明
GAO Shu-ming (No. 3 Oil Production Plant of Daqing Oilfield Company Ltd.

摘要(Abstract):

针对萨北开发区油层沉积特点及特高含水期剩余油分布特点,以水动力学原理为指导,对以往周期注水的效果进行分析,在已有的实践经验基础上,结合数值模拟研究,优化周期注水方式及各项参数,引入了油井间歇采油改变液流方向改善开发效果的做法,在实践中取得了较好的效果。
Aiming at the remaining oil distribution in ultra-high water cut stage and oil layers depositional features in the north of Saertu oilfield, guided by the hydrodynamic principle, and based on the practical experience and analysis of cyclic water flooding in combination with numerical simulation, cyclic water flooding and various pa- rameters are optimized, intermittent production of oil wells to change fluid direction is adopted so as to improve the development effect which has acquired favorable result in the test area.

关键词(KeyWords): 特高含水期;周期注水;周期采油;方式优化
ultra-high water cut stage; cyclic water flooding; cyclic production; method optimization

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 高淑明
GAO Shu-ming (No. 3 Oil Production Plant of Daqing Oilfield Company Ltd.

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享