多段分层注水井逐级解封封隔器研制与应用DEVELOPMENT AND APPLICATION OF THE STEP-BY-STEP RELEASABLE PACKER IN THE STAGED LAYERED WATER INJECTOR
李丹
LI Dan
摘要(Abstract):
常用压缩式封隔器的技术结构普遍是坐封时用解封销钉来锁住整个坐封机构,保持胶筒压缩,解封时通过剪断这个销钉实现胶筒的释放。如果解封销钉小一些,注水过程中外压升高时,销钉常常会自动剪断使封隔器解封;如果加大销钉,每一级封隔器解封力增大,导致管柱上提力逐渐增加,致使解封困难。针对这个问题,通过改变封隔器的技术结构,使坐封机构和解封机构脱离,研究设计了能实现逐级解封的注水井可洗井封隔器,从而改变了常规水井封隔器管柱上提整体管柱、封隔器胶筒同时摩擦套管壁的概念,每级封隔器单独承受上提管柱的解封力,从最上一级封隔器开始依次解封。现场应用表明,逐级解封封隔器实现了管柱在封隔器逐级解封的情况下小载荷起出,从而有效地解决了管柱无法顺利起出的问题,为多层段细分注水提供了技术保障。
The technical structure of the commonly used compression-type packer generally refers to the whole-sealed one locked by the releasing pin when set so as to ensure the rubber cylinder compressed and released by the pin when releasing the plugging. If the pin is a bit smaller,when the pressure is risen in the course of the water injection,the pin is often automatically cut and cause the packer released; if the pin is a bit bigger,the releasing force will be increased for each step of packer,this condition will result in the gradual power rise of the string pulled out,thus the release will be rather difficult. In the light of the following problem,by changing the technical structures of the packer and making the setting and releasing mechanisms separate,the washable water-injector packer has been developed and designed to realize the progressive release,and the concept has been changed for the simultaneous friction of the casing wall when the whole string and rubber cylinder pulling upwards for the conventional water-well packer string,each step of the packer can individually stand the releasing power of the pulled string,and finally the release can be realized step by step from the top packer. The field application shows that the step-by-step packer has realized the small-load string pulling under the condition of the step-by-step release of the packer,therefore the problem of having no way to smooth pull the string has been effectively solved. All the a-chievements have provided the technical guarantee for the multi-interval subdivided water injection.
关键词(KeyWords):
封隔器;逐级解封;封隔器研制;分层注水;结构设计
packer;step-by-step release;packer development;layered / separate water injection;structural design
基金项目(Foundation): 中国石油股份公司科技攻关项目“高含水油田提高采收率关键技术”(2011B-1506)
作者(Author):
李丹
LI Dan
参考文献(References):
- [1]张利君.双胶筒封隔器的研究与应用[J].大庆石油地质与开发,2006,25(增刊1):16-18.
- [2]杨国庆,侯宪文,刘玉龙.萨北油田注水工艺技术发展方向及评价[J].大庆石油地质与开发,2006,25(增刊1):19-21.
- [3]高志刚,高波,孟楠.喇嘛甸油田注入井高渗透层胶筒封堵技术研究[J].大庆石油地质与开发,2003,22(3):25-27.
- [4]杨宝泉,郭虎,陈冲.水平井机械分段酸化技术研究与应用[J].大庆石油地质与开发,2010,29(3):24-25.
- [5]张建军.喇嘛甸油田特高含水期层内精细挖潜工艺[J].大庆石油地质与开发,2006,25(5):21-23.
- [6]刘巨保,党黎明,付茂青,等.封隔器胶筒轴向压缩大变形与双重接触力学分析[J].石油机械,2014,42(7):49-50.
- [7]程心平.扩张式封隔器胶筒参数优选[J].石油机械,2014,42(7):65-66
- [8]罗伟,付建红,杨兰田,等.自膨胀封隔器密封性能影响因素分析[J].石油机械,2013,41(9):64-65.
- [9]张晓林,张棣,武玉贵,等.封隔器胶筒结构优化及优化方法比较[J].石油机械,2013,41(6):72-73.
- [10]张丽娟,赵广民,赵粉霞,等.压缩式裸眼封隔器的研制与应用[J].石油机械,2012,40(12):82-83.
- [11]晏耿成,魏立军,杨会丰.大压差可洗井封隔器研制与应用[J].石油矿场机械,2014,43(1):69-71.
- [12]伊伟锴,吕芳蕾,温盛魁,等.套管外封隔器模拟试验装置研制与应用[J].石油矿场机械,2014,43(3):75-77.
- [13]张蔚红,张建华,王卫锋.基于感应加热的封隔器高温高压试验装置研制[J].石油矿场机械,2014,43(2):25-28.
- [14]吕拴录,杨向同,冯春,等.跨隔完井管柱封隔器中心管断裂原因分析[J].石油矿场机械,2014,43(4):52-57.
- [15]申晓莉,陈立海,王子建,等.多级分注井逐级解封封隔器研制[J].石油矿场机械,2014,43(4):71-73.
- 封隔器
- 逐级解封
- 封隔器研制
- 分层注水
- 结构设计
packer - step-by-step release
- packer development
- layered / separate water injection
- structural design